Rehabilitation der Strasse Lugoj - Timisoara

---------------------------------------------------------------------

Die Strassenanbindung an Timisoara wird Rehabilitiert:

dazu folgende Daten von der Homepage der Firma die das Projekt durchführt.

----------------------------------------------------------------------------------------------------------------------------------

Projects/ AEGEK

"Road Improvement Project for National Road No 6. Contract JO2

- Improvement of Existing Road between Timisoara and Lugoj ROMANIA

WEST ROMANIA

----------------------------------------------------------------------------------------------------------------------------------

.

DESCRIPTION OF THE WORKS

The project includes the rehabilitation and completion of Timisoara - Lugoj road which includes approximately 50 km of road rehabilitation and the rehabilitation of 10 bridges including the new construction of 3 bridges.

----------------------------------------------------------------------------------------------------------------------------------

Basic Technical Data

Earthworks

Excavation in borrow pit:46.500 m3


Excavation in longitutinal profile: 50.000 m3


Filling: 96.500 m3


Road Pavement

Ballast layer: 153.600 m3


Asphalt wearing with cellulose fibers: 590.700 m2


Asphalt binder course: 85.300 tons


Base course asphalt mixture: 243.000 tons


Stabilized ballast with cement: 127.500 m3


Recycling of exsting road structure: 248.500m2


Drainage

Ditch paved -concrete precast elements: 7.600 m


Gutter paved -concrete precast elements: 22.000m


Bridges

Structure excavation: 1.655 m3


Reinforcement steel bar: 183 tons


Concrete: 3.222 m3


Formwork: 4.455 m2


---------------------------------------------------------------------------

CLIENT

NATIONAL ADMINISTRATION OF ROADS
---------------------------------------------------------------------------

CONSULTING ENGINEER

CONSTRUCTION PROJECT CONSULTANTS
---------------------------------------------------------------------------

CONTRACTOR

J/V EFKLIDIS - KONOIKE - AEGEK
---------------------------------------------------------------------------

CONSTRUCTION

J/V EFKLIDIS - KONOIKE - AEGEK
---------------------------------------------------------------------------

CONSTRUCTION PERIOD

28/10/2002 - 30/4/2005
---------------------------------------------------------------------------

PROJECT VALUE

JPY 3.134.244.622

25.857.971 Euro

[1Euro = 121,21 JPY Rate 10/2002]

Hinweis: Aus dem Urteil vom 12. Mai 1998 (312 O 85/98) des Landgerichts Hamburg geht hervor, dass man durch das Setzen eines Links auf fremde Webseiten die Inhalte dieser Seiten mit zu verantworten hat. Dies kann nur dadurch verhindert werden, dass man sich ausdrücklich von den Inhalten dieser Seiten distanziert. Für alle Links meiner Homepage gilt daher: Ich erkläre hiermit ausdrücklich, dass ich keinerlei Einfluss auf die Gestaltung und die Inhalte der Seiten habe, zu denen ich einen Link gesetzt habe. Ich distanziere mich hiermit ausdrücklich von allen Inhalten aller gelinkten Seiten und mache mir deren Inhalte nicht zu Eigen.

Oliver Edelmann

©2001-2004 Oliver Edelmann